Linear Tickets
Updated 2026-10-01
Linear Tickets
Section titled “Linear Tickets”What this source contains
Section titled “What this source contains”- Issues describing features, bugs, and their motivation
- Project docs attached to issues (often PRDs or specs)
- Parent/sub-issue relationships (broader initiative → specific tickets)
- Comments on issues (clarifications, scope changes, “why we’re doing this” rationale)
- Labels (e.g.,
compliance,customer-request,perf) that signal the type of motivation - Status updates that explain scope changes
- Attachments and linked GitHub PRs
Linear is where the product/business context often lives: the “we’re doing this because customer X asked” or “this is for the Q3 compliance initiative” layer.
How to search it
Section titled “How to search it”Use the Linear MCP.
- Start with linked tickets. If the seed commits or PRs reference ticket IDs (e.g.,
ENG-1234,[BUG-567]), fetch those first withget_issue. Read the full issue including comments. - List related issues by keyword. Use
list_issueswith text search for the feature name, key symbol, or business term. Try multiple phrasings. - Walk the issue tree. If you land on a sub-issue, fetch its parent. Sub-issues are tactical. Parents often carry the “why.”
- Read project docs. If the issue belongs to a project, use
get_projectand check attached docs. Project-level documents are where specs and rationale are most often captured. - Check labels and milestones. Labels hint at the category of motivation (customer-request, incident-followup, compliance). Milestones tie work to deadlines, which often reveal motivation.
What good evidence looks like here
Section titled “What good evidence looks like here”- An issue description stating the business problem: “Customer Acme needs X because of their SOC2 audit”
- A comment recording a decision: “We decided to go with approach B because approach A would require touching the billing service”
- A parent issue titled like an initiative: “Q3 Enterprise Readiness” or “Reduce Payment Failures”
- An attached PRD or spec
- Labels like
customer:acme,incident-followup,compliance,perf-regression
Common pitfalls
Section titled “Common pitfalls”- Scope drift. The ticket the PR references may have been closed and reopened with a different scope. Read the whole history.
- Mechanical templates. Some teams require “Why” sections but fill them with boilerplate. Generic text (“improve user experience”) is probably not a real answer.
- Stale tickets. Old tickets often reflect a version of the plan that changed. Check dates and cross-reference with the code’s ship date.
- Closed-as-duplicate chains. Follow the duplicate-of relationships back to the canonical ticket.
- Private workspace content. If you can’t access an issue, note that as a gap rather than guessing.
What to return
Section titled “What to return”For each relevant ticket:
- Ticket ID and title
- The problem/motivation quoted from the description or comments (not paraphrased. The synthesizer needs the exact text to cite)
- Labels, parent issue, project
- Author, created date, closed date
- Link to the ticket if available
This is an unofficial Chinese learning site for pstack. It is not affiliated with poteto. Translations follow the pstack/ directory in the cursor/plugins repository. This site does not ship a Chinese plugin. github.com/cursor/plugins